Recently, XJ WRTS-800 wind turbine simulation systems and PRDS-600 Pitch simulation systems, wind power control technology R & D Center successfully put into operation.
XJ WRTS-800 wind turbine simulation system consists of XJ Electric and the joint development of the University of California, truly the wind turbine machine object of the real-time simulation, to be completed small wind turbine on-line real-time simulation and control system development test work . The successful development of the system to fill gaps in the wind power industry, for our wind turbine generators control system for self-development and design of a landmark.
The system consists of wind resources, mechanical drive, electrical systems, control systems, wind round, tower and other simulation model, and configure a variety of analog signal generator and signal logic control unit. The computer equipment in the strong backing of the system to meet real time requirements, while maintaining a simulation model of high precision and high fidelity, for wind generator control system of developing and manufacturing 提供 complete functional testing of achieving a “Quanmian simulation Shiyan , the limit condition tests, field failure can be reproduced, reduce on-site commissioning time “, to ensure that control systems on the reliable operation of the fan.

Wind power generators main control system

XJ PRDS-600 Pitch simulation system consists of XJ Electric Company and the Hong Kong Science and Technology University, is the world’s first fully meet the Pitch System Operation Simulation System test requirements.

Pitch Simulation System

The system solved the pitch system can not be fully field test conditions, test cycle is long, difficult to reproduce the problem fault. The main functions are: operating condition simulation test, the system dynamic performance test, pitch motor performance testing, simulation testing network fluctuation, low voltage through functional testing, security testing.
The two successful application of simulation test system for the XJ the next step in the development of wind power industry to provide strong technical support

Related Articals