10 million kwh of wind power in China’s first “model” shows the Shanghai World Expo
Walking in the Gobi desert is boring, but the western end of Hexi corridor Jiuquan miles within the Gobi Desert, jumped into the eyes lined windmill generators, like an oasis, so feel suddenly heated up. Wind power companies in Gansu Province WANG Ning Bo, director of an interview with reporters today, said, with the gradual expansion of Gansu scale windmill power, windmills all over the Gobi and deep eco-tourism benefits are prominent features.
WANG Ning Bo introduced Jiuquan, Gansu provincial government use for the mountains north and south, central part of the flat, open desert, the natural formation of two mountains and one trough, a geographical advantage of what wind channel, launched in 2009, planning and construction of 10 million kwh of China’s first domestic wind power bases, the Shanghai World Expo Gansu Museum of wind power “model” came from this base, aims to introduce clean energy in today’s and future society, Gansu Province and even China to adjust energy structure, energy conservation significance produced, so that Gansu’s resources more fully into play, and to promote the development of equipment manufacturing industry, thus changing pattern of economic development and structural adjustment, the final push to improve people’s livelihood.
Gansu is a country rich in wind power generator resources, one of the provinces, according to “Wind Power Project in Gansu Province Planning Report” and the results of the latest analysis of meteorological departments, the province’s 10-meter high wind energy resource of about 237 million kilowatts of total reserves, total reserves of wind energy fifth in the country, occupies the country can be developed using the third, the annual effective wind energy reserves in more than 800 kwh per square meter.
August 1995, Gansu Provincial Power Company yumenzhen about 12 kilometers southeast of building a 30-meter-high wind towers, and began to wind power generator development for the purpose of wind resource monitoring. After 10 years of development, the first wind farms in Gansu Province from the initial stage of 01,200 kilowatts and gradually developed into a total scale of 110 thousand kilowatts of large-scale wind farms.
Wang Ning Bo said that wind power installed capacity in Gansu this year will reach 5.25 million kilowatts, compared with traditional thermal power could reduce carbon dioxide emissions by around 13 million tons, sulfur dioxide emissions by 15,000 tons, about 10,000 tons of dust emissions, the annual power generation 11.5 billion kwh, an alternative thermal power 3.7 million tons of standard coal in savings, annual savings of more than 10 million cubic meters of water resources, contributed to the ecological environment.
In an interview with reporters in Gansu, Hexi Corridor, Gansu Jiuquan many times through the lot of wind power base, is pleased to stop every time, and many strangers together enjoy the patchwork of Windmill pedestrian woven mesh picture, which shows vitality, feeling so dull as the original windmill “whining” of the rotation disappeared.
The windmill height of 44 meters, from the three long leaves composed of more than 20 meters, generators export voltage 690 V, step-through box-type transformer of 10 KV, 110 KV boost after the grid. Check the many Jiuquan base of wind power company CEOs, has expressed confidence on wind power development. Wang Ning Bo said, according to wind power development plan in Gansu Province, since 2020, expanded to 40 million kilowatts installed capacity over that time, Hexi Corridor has become the world’s largest wind power base.
Related Articals
评论关闭
