Wind turbine manufacturing
Wind power generator projects in full preparation, while Fujian Electric Power also invested heavily in wind turbine manufacturing investment base project. Allegedly, the project will introduce international advanced level of direct drive Daxing offshore wind power equipments technology to fill the Fujian Province in large Fengji wind generators manufacturing fields blank and promote wind power industry chain extension.
After completion of the project will be the biggest fan Hercynian manufacturing base. Under the strategic cooperation agreement, the project plans to build fan base in manufacturing at least one assembly plant and a fan factory, the main production apply to terrestrial, coastal, offshore wind farms of large offshore wind equipment, designed to reach one million kilowatts in wind power machine’s production capacity, estimated initial investment of 800 million yuan. Fan manufacturing base project will be based in Fujian, the whole country, through the introduction of advanced two-megawatt turbines and larger wind turbine generator manufacturing technology, production settled Ningde sales.
But industry analysts also noted that while offshore wind power has a higher than land-based wind power technical barriers, less competitive, get better profits. But the short term, the development of offshore wind power on a limited positive effect on the performance of listed companies.
Related Articals
评论关闭
