Recently, Inner Mongolia, State Power in Iraq and a Mu 49.5 MW wind farm wind turbines in a first grid success and smooth operation, 33 Typhoon aircraft into the 240 hours of comprehensive commissioning work.

Mu Yi and tin wind farm is located 112 km Nepalese Town of NATO, in Kubuqi Mu Us Desert and the junction of the Mongolian investment company can be put into operation the third wind farm. Installed capacity of 300 MW project planning project, the current installed capacity of 49.5MW, total investment 471 million yuan. Theory of annual generation capacity of the project 166,854,000 kwh, wind turbines generator use the equivalent full load hours of 2379 hours.

Construction of wind farms will supply the region, tourism, taxes play a positive role in promoting conducive to stimulating economic development Hangjinqi. In addition, compared to coal-fired wind power generation, the construction of wind farms can reduce soot emissions about 99 tons, about 125 tons of sulfur dioxide, carbon dioxide, about 1,100 tons, 466 tons of standard coal per year savings. In short, it will greatly reduce the pollution of the surrounding environment, but also the use of natural renewable resources, saving non-renewable fossil fuels and protecting the environment

Related Articals